返回首页
AI on Medium··行业媒体

Texas Has a 466-Gigawatt Line for AI Power. Only 3.9 GW Is Actually Plugged In.

中文摘要

德州拥有466吉瓦的AI电力潜力,但目前仅接入3.9吉瓦,导致该州已暂停数据中心许可。

English Summary

Texas has 466 GW of potential AI power capacity, but only 3.9 GW is connected, causing the state to freeze data center permits.

原文节选

This week Texas froze data center permits. ERCOT’s own numbers, and the grid data we track at Grid Alpha, show why the AI story there has… Continue reading on Medium »